| Inspection |
| 1. |
Measure the resistance between the terminals.
|
| 2. |
If the measured resistance is not within specification, the blower resistor
must be replaced. (After removing the resistor.)
|
| Replacement |
| 1. |
Disconnect the negative (-) battery terminal.
|
| 2. |
Disconnect the connector (A) and then remove the blower resistor (B)
after loosening the mounting screws.
|
| 3. |
Install in the reverse order of removal.
|
Blower Motor Repair procedures
Power Mosfet (DATC) Repair proceduresKia Cee'd JD Service Manual: Power Window Relay Repair procedures
Inspection
1.
The power SJB can be diagnosed by using the GDS. The SJB communicates
with the GDS which then displays inputs and outputs along with codes.
It will be able to diagnose defects of power window with GDS quickly.
GDS can operates actu ...
: SYNC
Argentina
Brazil
China
Djibouti
European Union EU
Ghana
Jamaica
Malaysia
RBAB/57H/0318/S(18-0624)
Mauritania
Moldova
Morocco
Pakistan
Paraguay
NR: 2017-12-I-0000413
Serbia
Singapore
South Africa
South Korea
MSIP-CMM-pAs-FA-170-BCAR-HS
Taiwan
Ukraine
United Arab Emirates (U.A.E.)
...