Removal |
1. |
Remove the cylinder head cover.
(Refer to Cylinder Head Assembly - "Cylinder Head Cover")
|
2. |
Remove the timing chain cover.
(Refer to Timing System - "Timing Chain Cover")
|
3. |
Remove the timing chain.
(Refer to Timing System - "Timing Chain")
|
4. |
Remove the intake CVVT assembly and exhaust CVVT assembly.
(Refer to Cylinder Head Assembly - "CVVT Assembly")
|
5. |
Remove the camshaft bearing caps (A) with the order below.
|
Inspection |
1. |
Inspect the cam height.
Using a micrometer, measure the cam height.
If the cam lobe height is less than specified, replace the camshaft.
|
2. |
Check the cranshaft journal for wear.
If the journal is worn excessively, replace the camshaft.
|
3. |
Inspect the camshaft journal clearance.
|
4. |
Inspect the camshaft end play.
|
Installation |
1. |
Install the camshaft bearing caps(A) with the order below.
|
2. |
Install the intake CVVT assembly and exhaust CVVT assembly.
(Refer to Cylinder Head Assembly - "CVVT Assembly")
|
3. |
Install the timing chain.
(Refer to Timing System - "Timing Chain")
|
4. |
Install the timing chain cover.
(Refer to Timing System - "Timing Chain Cover")
|
5. |
Install the cylinder head cover.
(Refer to Cylinder Head Assembly - "Cylinder Head Cover")
|
Kia Cee'd JD Service Manual: Front Door Module Repair procedures
Replacement
1.
Remove the front door window glass.
(Refer to Front Door - "Front Door Window Glass")
2.
Remove the front door outside handle.
(Refer to Front Door - "Front Door Outside Handle")
...
Kia Cee'd JD Service Manual: Shift Lever Components and components location
Components
1. Knob & Boots
2. Shift lever assembly
3. Shift cable
4. Select cable
5. Control cable retainer
...